Before you start: plan the layout on paper
Sketch where the battery, inverter, charge controller, and fuse panel will sit before running a single cable. Keep cable runs as short as possible — voltage drop over long 12V runs is a real efficiency loss, and shorter runs also mean cheaper (thinner-gauge-capable) cable for the same current.
Step-by-step order
- Mount the battery in a secure, ventilated location, ideally with some temperature stability (not directly against an exterior wall in an unheated area if you can avoid it).
- Fit a fuse or circuit breaker directly at the battery's positive terminal, rated just above your maximum expected current, before running any cable onward. This is the single most important safety step and the one most often skipped by beginners.
- Wire the inverter with appropriately-sized cable for its full rated current, with its own fuse close to the battery.
- Connect the charge controller between the solar panel and the battery, following the controller's specific wiring order (battery first, then panel, is the standard safe sequence on most controllers — check your manual).
- Add a battery monitor shunt in the main negative return path, following the manufacturer's placement diagram exactly — shunt position matters for accurate readings.
- Test under load before closing everything up — run your heaviest appliance briefly and check for excessive heat anywhere in the system.
Safety note: if you're not confident with 12V wiring, DC circuits carry enough current to cause a real fire risk if under-fused, even at "safe" low voltage. A pre-matched kit with a wiring diagram, or a qualified installer, is money well spent if in doubt.
Renogy 3.84kWh Motorhome Power Kit
Comes with a matched wiring diagram for the full kit — complete system
Check price on Renogy UK